Legality (show more) |
---|
Standard Ban List 23.09 (latest) |
Standard Ban List 23.08 (active) |
Rotation |
---|
Deck valid after Sixth Rotation |
Welcome to the fifth iteration of the Project CROW mini-campaign for beginners familiar with System Gateway and System Update 2021.
It consists of a set of duel decks that are upgraded over three stages. We start at the first stage mainly with cards from System Gateway + System Update 2021, but introduce a few key cards from the Standard pool (see here for further information on the tournament formats Startup and Standard).
At stage 2, we open up the card pool to the Startup format, but also add some more necessary Standard cards to teach some further elements.
Stage 3 are the two decks Frog off, Keeling! and Calibrating...TUCANA! that @percomis
and myself brought to the 2023 EMEA Continentals placing 16th and 30th respectively (out of a total of 145 players).
We arrive at the final stage. This is the actual deck that we played at EMEA Continentals 2023. Not much has changed from stage 2, but one of the changes is very important.
Hermes opens up even more lines of play. You do not only get to use Clot to deny the option of fast advancing cards, but you can use your multi access tools in Legwork and Deep Dive to also contest never advance attempts (installing an agenda to score next turn without advancing it). If you see the Corp on 5 points installing something in a remote, it might be time to fire off your multi access to fish for an agenda and bounce that card back into HQ. Rinse and repeat until you reach 7 points.
Be aware that controlling all options of the Corp can be difficult to sustain and they now have tools like Border Control in their deck, that can block Deep Dive attempts or at least make them very unprofitable. You are on a fast clock, especially with their Tucana triggering on every score and steal, so make every click and every credit count!
These links show you all the necessary cards to build all three stages of the lists and give dedicated in/out lists for each stage transition.
Corp Overview | Runner Overview
0 comments |
---|